Responsibilities

Quality

How we check materials, fabrication and installation, and how every stage is recorded.

One company, start to finish

From survey and working drawings through to fabrication, installation and handover, responsibility for the finished work stays with Clivnars.

Before an order is accepted, it is reviewed by a Director to confirm that it can be manufactured within the system parameters and that the required delivery dates are achievable.

Project-specific working drawings are then prepared, reviewed and submitted to the client for approval before anything is released for manufacture.

Our quality management system

Clivnars operates a quality management system certified to ISO 9001:2015 by Citation ISO Certification Limited.

Certificate 137282007 covers the fabrication and installation of aluminium and PVCU windows, doors and associated products.

Every section of the quality management system is audited internally at least once a year. The Directors also carry out a formal management review at intervals of no more than twelve months, covering areas including audit results, non-conformances, customer feedback, supplier performance and quality objectives.

Built to the system specification

We fabricate Technal and Comar systems using the specifications, materials and components defined by the system suppliers.

Profiles, gaskets and other components must correspond with those used in the system's product testing, and units are manufactured within the tested parameters for that system.

We do not make changes that would invalidate the product's declared performance, certification, regulatory compliance or the requirements of the project.

Checked throughout fabrication

Every window and door is identifiable by its job number and carries a Quality Control Label from the start of the production line.

As the unit moves through cutting, preparation, assembly, hardware, beading and glazing, each completed stage is checked and recorded before the frame progresses through production.

A unit cannot leave our factory until the required checks have been completed. The Factory Manager is responsible for authorising release following the acceptance checks.

If anything does not meet the required specification, it is identified, separated from conforming work and held until it has been reviewed and the appropriate action agreed.

Inspected before handover

Our installers work to written installation instructions under the supervision of Site Supervisors, with Project Managers responsible for arranging interim and final inspections.

Once the installation is complete, a Site Supervisor or Project Manager carries out a final inspection against the installation requirements.

A successful inspection is recorded on an Installation Approval Form, and the installation is only handed over once those acceptance checks have been completed.

Project sign-off records and photographs are retained within the project file.

Materials and suppliers

Quality control starts before fabrication begins.

Incoming materials are checked against the purchase order and visually inspected when they arrive. Any material that does not conform is identified and quarantined, with rejected goods returned to the supplier.

Materials are purchased from suppliers on our Approved Supplier Register, and supplier performance forms part of our quality management process.

Concerns and feedback

If you raise a concern with us, it is recorded and passed to the Installation & Service Manager so that it reaches the people responsible for resolving it.

The nature of the issue, the action taken and its outcome are recorded, with the cause investigated where appropriate.

Complaints, non-conformances and corrective actions are reviewed as part of our management review process so that recurring issues can be identified and addressed.

We also request feedback from a selection of completed projects as part of our ongoing review of customer satisfaction and the effectiveness of our quality system.

Quality from the first drawing to final handover

Our quality process follows the job through design detailing, material control, fabrication, factory inspection, installation and final sign-off.

With those stages managed within one company, responsibility stays clear from the point an opening is measured to the point the completed installation is handed over.