A completed Clivnars installation: a dark grey aluminium glazed elevation of full-height windows, doors and infill panels beneath a patinated copper fascia, with established planting along the front.

Responsibilities

Environment

How we manage materials, waste, transport and energy across our factory and installation work.

Where it goes

We are registered with the Environment Agency as an upper-tier waste carrier and dealer, registration CBDU90832. Aluminium and steel are segregated and go to a local metal scrap yard for recycling. General waste goes into a skip collected by a local waste management contractor, who sort it at their site rather than sending it straight to landfill.

Cardboard and packaging are flattened and recycled, and packaging is reused where it can be. Sealant tubes, chemical containers and other hazardous waste are handled under COSHH regulations. A waste transfer note is kept on file for every collection, so each one can be audited.

Old frames and glass taken out of a building are handled in line with ISO 14001, the environmental management standard.

Buying only what the job needs

Because we fabricate what we fit, we know the cutting list before we order the aluminium. Material is optimised in software and bought for the specific project, in the quantities that project needs, which keeps offcuts and surplus stock to a minimum.

Materials are bought in bulk where that reduces delivery trips, from local suppliers where we can, and preferably from suppliers whose packaging is recyclable.

On the road

Fuel for our vehicles is one of the main sources of our carbon emissions. Installation routes are planned to reduce mileage, deliveries and site visits are combined where the programme allows, vehicles are maintained to keep them efficient, and drivers are instructed not to leave them idling.

In the workshop and the office we use LED lighting, switch machinery and equipment off when it is not in use, and monitor our electricity consumption. When equipment is replaced, the more efficient option is considered first.

Who we buy from

Subcontractors are approved before they are engaged, and environmental competence is part of that approval. Depending on the work, we ask for an environmental policy, a waste carrier's licence, recycling arrangements, COSHH assessments, method statements covering environmental controls, and waste transfer notes.

We check it afterwards as well as beforehand, through site inspections, waste paperwork, toolbox talks and inductions. A subcontractor who does not meet the standard can be taken off the approved register.

What we measure

We keep records of waste transfer notes, material recycling, vehicle mileage, fuel receipts, electricity usage and bills, supplier environmental information, and a log of environmental incidents and complaints.

Management review all of it once a year, covering waste levels and recycling rates, energy, fuel, any incidents, and feedback from employees and clients. The review is recorded along with the actions that come out of it.

Environmental policy and review

Behind this page is a written environmental policy signed by our Managing Director, four supporting procedures covering waste, carbon and energy, supply chain and monitoring, and a set of objectives reviewed every year.

We manage and review these arrangements ourselves, and do not currently hold ISO 14001 certification.

Discuss your project with our team

Contact our estimating team to discuss your project, tender or pre-qualification requirements.

Discuss your project